Occam
by EVM Synths
Show more
No website
System :
Win32
Format :
VST
EVM Occam is a dual channel wavesample synthesizer.
Download includes both Occam Extended and Occam SE versions.
Download includes both Occam Extended and Occam SE versions.
- 2 osc with freq, Q and ratio controls.
- 13 waveforms (2x).
- Mod matrix (Peak, Sync, Phase).
- Dual channel stereo enhancer with time, feedback and level controls.
- Modulation rate, level, freq and Q controls.
- Envelope ADSR (2x) for Env > Filter and Filter > Env.
- Panning for both oscs.
- Frequency exciter.
- 16 presets.
Downloads
Win 32 VST
(7.1 Mb)
V1.1
Tatum
(3/5)
Mar 11 2017
Ottimo choir e orchestral