mnemonic
by EVM Synths
by EVM Synths
4.3 / 5
(4 votes)
Win32
VST
EVM mnemonic is an experimential device based upon a hybrid additive oscillator.
The Gemini Wave Oscillator produces two waveforms by calculating math equations in real time. Add to this the generation of 8 harmonic waves by sub-dividing the output and the result is a unique sounding synthesizer.
The Gemini Wave Oscillator produces two waveforms by calculating math equations in real time. Add to this the generation of 8 harmonic waves by sub-dividing the output and the result is a unique sounding synthesizer.
Downloads
Win 32 VST
(1.4 Mb)
(3 / 5)
Found it a bit noisy and Logic compared to the other excellent EVM Synths
(5 / 5)
This is great for extended ever changing drones.
(5 / 5)
Just...Wauuu!!! Thnx!
