Gnome
by EVM Synths
by EVM Synths
4.0 / 5
(4 votes)
Win32
VST
EVM Gnome is a 2 wave oscillators arpeggiator synthesizer.
- 2 Oscillators with 71 waveforms in total.
- 2 State Variable filters.
- 5 Envelope generators.
- 4 LFOs.
- 2 Digital delays.
- 1 Stereo reverb simulator.
- BPM gated arpeggiator.
- XY Mouse Pad controller.
- A complex modulation matrix.
Downloads
Win 32 VST
(1.3 Mb)
(4 / 5)
I couldn't get any modulation to work, but the overall sound is really versatile. The filter ratio dial is helpful with bandpass filtered sounds. I was able to get nice squelchy trance synth sounds. 4/5 definately useable and interface isn't too crazy. Thankfully the GUI isn't too big too, which is a plus for us puny laptop users.
(3 / 5)
Not bad
(4 / 5)
Goood!!
